A whole-house refurbishment is the most expensive thing most homeowners ever spend on construction — typically £60,000 for a cosmetic refresh of a 3-bed terrace to £250,000+ for a full strip-out of a 4-bed semi with structural alterations. This guide sets out the three tiers (cosmetic, mid-spec, full strip-out), real 2026 cost-per-m² figures for the South East, and what good and bad quotations look like.

2026 cost table

Project scopeFromToNotes
Cosmetic refresh — 1-bed flat (50 m²)£18,000£40,000Paint, floors, light rewire
Mid-spec — 2-bed flat (70 m²)£40,000£75,000Kitchen + bathroom + rewire
Full strip-out — 2-bed flat (70 m²)£70,000£120,000Plaster off, full rewire, replumb
Cosmetic — 3-bed terrace (100 m²)£30,000£60,000No structural changes
Mid-spec — 3-bed terrace (100 m²)£60,000£120,000New kitchen + 2 bathrooms
Full strip-out — 3-bed terrace (100 m²)£100,000£180,000Plaster off, structural opening
Full strip-out + ext — 3-bed terrace£150,000£250,000Rear extension included
Full strip-out — 4-bed detached (160 m²)£180,000£300,000Plus garage / outbuilding

Indicative ranges for London & South-East England, 2026. A site visit firms the figure to ±5%.

What's typically included

  • Strip-out and removal of existing finishes
  • Replumbing and rewiring to current Building Regs (where in scope)
  • Plasterboard and skim throughout (full strip-out)
  • Standard internal doors, skirting and architrave
  • Carcassing labour for new walls, ceilings and openings
  • Project management and weekly progress reports

What's usually excluded

  • Kitchens, bathrooms and white goods (client supply)
  • Floor finishes — tile, hardwood, LVT, carpet
  • High-end joinery (bespoke wardrobes, panelling)
  • Furniture, curtains, blinds
  • Smart-home wiring above standard
  • Garden and external landscaping

What drives the price up

Strip-out depth

Skim-over-existing is the cheap end. Plaster-off-back-to-brick reveals damp, structural cracks and old wiring — adding £15,000–£30,000 in remediation on a typical Victorian terrace.

Replumbing and rewiring

Full rewire of a 3-bed terrace is £6,000–£10,000. Full replumb (new heating, hot/cold runs, new boiler) is £10,000–£18,000. Both are standard on a full strip-out but often skipped on a "cosmetic" budget.

Structural changes

Opening up the ground floor (knock-throughs, side-return openings) typically adds £8,000–£20,000 depending on number of steels and load-bearing walls involved.

Finish level

A trade-spec finish (PVC windows, white doors, off-the-shelf kitchen) at the lower end; designer paint, oak floors, F&B colours, hardwood doors, bespoke joinery at the upper end. Finish typically accounts for 30–40% of the total budget — and it's the line where homeowners overspend most often.

Damp and timber issues

Older properties almost always reveal damp, rot or timber decay once plaster is off. Budget a 10% contingency on a full strip-out.

Cost per square metre

A useful rule of thumb for the South East in 2026: cosmetic refresh £500–£900/m², mid-spec £1,200–£2,000/m², full strip-out £2,000–£3,500/m². Anything below £500/m² is a "decorator job" not a refurbishment; anything above £3,500/m² is high-end with bespoke joinery and designer finishes.

Timeline and on-site sequence

A full strip-out of a 3-bed terrace runs 14–20 weeks on site: 2 weeks of strip-out, 2 weeks of first-fix plumbing and electrics, 2 weeks of structural alterations, 2 weeks of plaster, 4 weeks of second fix and joinery, 2 weeks of decoration and snagging. Add 4–6 weeks of design and procurement upfront.

Live-in vs move-out

A cosmetic refresh can be done in stages while you live in the property. A full strip-out almost always requires moving out — both for noise/dust and because services (water, electrics) are off for weeks at a time. Allow £2,000–£4,000/month for temporary accommodation across the works period.

Frequently asked questions

How much does a full house refurbishment cost in 2026?

For a 3-bed terrace in the South East: cosmetic £30–60k, mid-spec £60–120k, full strip-out £100–180k. A full strip-out plus extension typically totals £150–250k.

What's included in a "full strip-out"?

Removing all internal finishes back to brick/joist, full rewire, full replumb, new boiler, new plaster, new ceilings, new internal doors, new kitchen and bathroom suites (supply usually by client).

How long does a refurbishment take?

A cosmetic refresh is typically 4–6 weeks. A mid-spec is 8–12 weeks. A full strip-out is 14–20 weeks on site, plus 4–6 weeks of design and procurement upfront.

Do I need planning permission for a refurbishment?

Most internal refurbishments don't need planning. You do need Building Control for any structural alterations, rewire (Part P) and plumbing changes. Listed buildings always need Listed Building Consent.

Will I need to move out?

A cosmetic refresh can be staged with you in residence. A mid-spec is uncomfortable but possible. A full strip-out requires moving out — typically 3–5 months.

Ready to talk numbers?

Get a free site visit and a fixed written quotation within 5 working days. No obligation, no hard sell.